
Air Quality Neutral & Positive Assessments
Air Quality Neutral & Positive Assessments assess whether a development meets or exceeds local policy requirements for minimising or offsetting air quality impacts, particularly in urban zones throughout London.
Build your quote in seconds — our team responds within 1 working hour.
Compliance Confidence Included
Pre-submission review, regulator-ready documentation, and 14 days of post-submission query support are included as standard — to reduce refusal risk and enforcement delays.
Air Quality Neutral and Air Quality Positive Assessments UK (London Plan) for Benchmarks, Mitigation and Policy Compliance
Air Quality Neutral and Air Quality Positive assessments support developments that must demonstrate compliance with London Plan Guidance and local policy expectations for minimising emissions and exposure. These assessments focus on quantifying emissions from buildings and transport, comparing performance against published benchmarks, and defining mitigation to achieve Air Quality Neutral requirements and, where applicable, Air Quality Positive outcomes. A robust submission is clear, evidence-led and directly aligned to planning validation requirements.
When These Assessments Are Required
Air Quality Neutral and/or Air Quality Positive work is typically required where:
- A development is in London (or a borough applying London Plan requirements) and must meet Air Quality Neutral benchmarks
- A large-scale development or masterplan triggers Air Quality Positive expectations and statements
- Planners require quantified evidence on building and transport emissions performance
- Mitigation needs to be defined, secured by condition, and demonstrated as deliverable
- There is high sensitivity due to existing poor air quality and receptor exposure risk
Purpose of the Service
The purpose is to demonstrate policy compliance clearly and reduce planning risk. These submissions show that emissions have been minimised through design (energy strategy, plant selection, logistics and travel planning) and that exposure has been considered and improved where required.
How the Assessment Is Used in Practice
In practice, planning delays occur when emissions benchmarks are not calculated correctly, when mitigation is vague, or when evidence does not match London Plan Guidance requirements. A good assessment provides transparent inputs, clear benchmark comparison, and a defined mitigation pathway that can be conditioned and delivered.
Scope and Typical Outputs
Where a wider planning assessment is required, see Air Quality Assessments.
- Building emissions assessment aligned to benchmark methodology (energy strategy and plant emissions)
- Transport emissions assessment aligned to benchmark methodology (trip generation, mode share and emissions)
- Mitigation strategy (design changes, plant specification, EV/active travel, consolidation, delivery management)
- Exposure reduction measures where needed (layout, ventilation intake placement, filtration strategy)
- Planning statement outputs suitable for submission and condition wording support
Standards, Guidance and Planning Context
These assessments are aligned to London Plan Guidance for Air Quality Neutral and Air Quality Positive. Requirements can vary by borough, so scope is tailored to local validation lists and officer expectations.
What the Service Delivers
- A clear Air Quality Neutral assessment with benchmark comparison and conclusions
- An Air Quality Positive statement/assessment where required by scale and policy
- Defined mitigation measures with deliverable actions and planning-ready wording
- Support for planning queries and iteration where required
Who This Is For
- Developers and planning consultants working under London Plan requirements
- Architects and design teams needing emissions and exposure-led mitigation
- Masterplan and strategic development teams needing Air Quality Positive outputs
Limitations and Scope
Outputs depend on the quality of transport and energy inputs. Early coordination with project teams improves accuracy and avoids late-stage rework.
Frequently Asked Questions
Is Air Quality Neutral required for all developments in London?
Many developments are expected to meet Air Quality Neutral benchmarks, with requirements varying by borough and scheme type. We scope to your validation requirements.
What is the difference between Neutral and Positive?
Neutral focuses on meeting benchmark emissions. Positive focuses on maximising local air quality benefits and reducing exposure, typically for larger-scale schemes and masterplans.
Do I still need an Air Quality Assessment?
Often yes. Air Quality Neutral/Positive work complements (and does not automatically replace) planning-led impact assessment where required.
Can you help define mitigation that planners will accept?
Yes. We focus on mitigation that is specific, deliverable and condition-ready (not generic statements).
Get environmental compliance quotes online
Skip the back-and-forth. Add the services you need, share your permit or scope, and Alkali responds with a clear, fixed-fee proposal — usually within one working day. Faster scoping, fewer emails, more accurate quotes.
- Fixed-fee proposal
- Specialist scope review
- Response within one working day
Online quoting reduces admin, avoids repeated emails, and helps operators get a faster, more accurate scope.
You May Also Need

Air Quality Assessments UK

Carbon Footprinting & Net-Zero Strategy

Air Dispersion Modelling UK (ADMS & AERMOD)
Services that often include Air Quality Neutral & Positive Assessments:
Need a Quote for Air Quality Neutral & Positive Assessments?
Add this service to your quote and submit a request. We'll review your scope and get back to you within 24 hours.