Our Work

    Case Studies

    See how we've helped clients across the UK achieve environmental compliance, meet planning requirements, and protect communities through expert monitoring and consultancy.

    Case Study: UK Lead & Silver Refinery — 19-Point Annual Emissions Monitoring in a Single Mobilisation

    Case Study: UK Lead & Silver Refinery — 19-Point Annual Emissions Monitoring in a Single Mobilisation

    Alkali delivered the annual MCERTS emissions monitoring programme for a major UK lead and silver refinery producing ~180,000 tonnes of refined lead per year. Coordinated multi-team sampling across 19 locations and two furnaces completed the campaign in a single mobilisation, with no impact on production and the technical report delivered within 20 working days.

    Metals Refining (Lead & Silver)
    United Kingdom
    June 2026
    MCERTS emissions monitoringlead refinerysilver refinery
    View Case Study
    Meeting Tight Deadlines with AEGL Assessments for a London Data Centre

    Meeting Tight Deadlines with AEGL Assessments for a London Data Centre

    Alkali Consultants supported planning approval for a new London data centre by assessing NO₂ concentrations against Acute Exposure Guideline Levels (AEGLs). Using advanced dispersion modelling across 40 sensitive receptors, we delivered results ahead of deadline.

    Data Centre
    London
    27th June 2025
    AEGLair quality modellingdispersion modelling
    View Case Study
    Real-Time Dust and Noise Monitoring at Lynemouth Beach

    Real-Time Dust and Noise Monitoring at Lynemouth Beach

    Alkali Consultants carried out real-time dust and noise monitoring at a landfill construction site near Lynemouth Beach. Using MCERTS Indicative dust monitors and Type 1 compliant sound level meters, powered by solar arrays, we ensured continuous monitoring in a remote location.

    Landfill / Construction
    Lynemouth Beach, Northumberland
    10th April 2025
    dust monitoringlandfill constructionnoise monitoring
    View Case Study
    Ensuring Compliance with a Solvent Management Plan for a Metal Coating Facility

    Ensuring Compliance with a Solvent Management Plan for a Metal Coating Facility

    Alkali Consultants prepared a Solvent Management Plan for a metal coating facility operating eight spray booths. Through on-site stack testing and recalculating operating hours, we reduced reported exceedances from 25% to below 15%, ensuring full permit compliance.

    Metal Coating Factory
    West Midlands, Yorkshire
    10th April 2025
    air quality solutionEnvironmental Agency requirementsplanning permission
    View Case Study
    Turning a Tight Deadline into Long-Term Success: Air Quality Support in the London Borough of Sutton

    Turning a Tight Deadline into Long-Term Success: Air Quality Support in the London Borough of Sutton

    Alkali Consultants mobilised a Dust Management Plan, automatic air quality monitoring and passive dust deposition gauges within hours for a construction site in the London Borough of Sutton — securing baseline data before works began and maintaining zero exceedances more than a year on.

    Construction / Development
    London Borough of Sutton
    Ongoing (since 2024)
    dust management planair quality monitoringconstruction dust
    View Case Study
    Case Study: Relocating a Stack Emissions Sample Point to Eliminate Work at Height and Improve Flow Conditions

    Case Study: Relocating a Stack Emissions Sample Point to Eliminate Work at Height and Improve Flow Conditions

    Case study — inspired by true events. After taking over a biannual MCERTS stack emissions monitoring contract, our UKAS-accredited stack testing team identified an equivalent ground-level sample location that removes the need for mobile access tower hire and improves duct flow conditions for more representative isokinetic sampling.

    Industrial / Manufacturing
    United Kingdom
    Case study — inspired by true events
    MCERTS stack emissions testingbiannual emissions monitoringsample point design
    View Case Study