Air Quality Assessments

1. Why Air Quality Matters (Evidence You Can’t Ignore)

Planning expectations have tightened again — and air quality is now a planning, legal, health, and programme-delay risk for nearly every development type.

Alkali Environmental Consultants provides UKAS & MCERTS-accredited air quality assessments, monitoring, and reporting — aligned to LAQM templates, England’s PM₂.₅ legal targets, and the latest IAQM methodologies — so your planning applications land first time.

Lives at stake every week

UK doctors estimate ~30,000 deaths per year linked to air pollution, costing tens of billions.
The Royal College of Physicians (RCP) warns air pollution affects nearly every organ system.
([rcp.ac.uk][rcp])

No safe level narrative

WHO (2021) cut guideline levels to:
PM₂.₅ = 5 µg/m³ and NO₂ = 10 µg/m³ — reflecting harm even at low concentrations.
([World Health Organization][who])

Risk rises with small increases

COMEAP recommends 1.08 relative risk per +10 µg/m³ PM₂.₅ (~8% higher mortality risk), with no safe threshold.
([GOV.UK][comeap])

Dieselgate legacy

A 2025 analysis estimates 16,000 premature UK deaths and 30,000 childhood asthma cases from illegal diesel defeat-devices; 124,000 early deaths across the EU/UK.
([CRECA][creca])

Bottom line:
Air quality is now a board-level risk — health, legal exposure, reputation and project delay.


2. Compliance Updates You Can’t Ignore (2023–2025 → Still Fully Applicable 2026+)

England’s PM₂.₅ legal targets

Annual mean ≤10 µg/m³ by 2040 and 35% population-exposure reduction (vs 2018).
DEFRA has planning guidance for demonstrating alignment with these targets.
([Legislation.gov.uk][leg201] | [Legislation.gov.uk][leg202])

LAQM expectations shape planning reviews

Planning officers increasingly assess reports against LAQM templates, technical notes and national guidance.
Align your report format to reduce queries and re-submissions.
([Local Air Quality Management][laqm])

Construction dust — IAQM 2024 update

IAQM 2024 tightens risk screening and mitigation — raising expectations for CEMPs, monitoring, and auditable control measures.
([IAQM][iaqm2024])

Low-cost sensors — IAQM 2025 position

Clarifies limits of low-cost PM₁₀ sensors, especially for short-term dust spikes.
Specifies when reference-grade equipment is required.
([IAQM][iaqm2025])

Industry & CEMS — EA M20 refreshed

2025 update clarifies EN 14181 QA/QC (QAL1–3 + AST), certification ranges, and documentation required.
([GOV.UK][eaM20])

EU direction (contextual benchmark)

The revised Ambient Air Quality Directive sets 2030 limits:

  • PM₂.₅ = 10 µg/m³
  • NO₂ = 20 µg/m³
    (Not UK law, but influential in best practice.)
    ([EU Directive][eu])

Latest national monitoring overview

DEFRA’s Air Pollution in the UK 2024 (published September 2025) summarises measured and modelled concentrations — useful for context and baselines.
([GOV.UK][airuk])


3. When You Need Air Quality Services (Planning, Construction & Operations)

Planning & design stages

  • Screening assessments
  • Full Air Quality Impact Assessments
  • Early engagement avoids planning delays and re-submissions
    (Align format to LAQM templates.)
    ([Local Air Quality Management][laqm])

Before construction

  • Baseline monitoring
  • IAQM-compliant dust risk assessments
  • Control plans for CEMPs
    ([IAQM][iaqm2024])

During construction

Deploy monitoring where IAQM risk screening indicates medium/high risk, especially during:

  • Demolition
  • Earthworks
  • Dry weather periods
  • HGV-intensive phases

Follow IAQM 2024 + IAQM LCS 2025.
([IAQM][iaqm2025])

Industrial operations (permitting)

  • Stack testing
  • CEMS QA/QC under EA M20 and EN 14181
    Many operators schedule spring/autumn QA to align with reporting cycles.
    ([GOV.UK][eaM20])

Post-completion

  • Validation monitoring
  • Evidence that planning-condition mitigation performs as intended

4. What Alkali Environmental Delivers

Air Quality Impact Assessments (AQIA)

For residential, commercial, industrial and mixed-use schemes.

Dispersion Modelling (ADMS)

Robust baseline and operational assessments.

Construction Dust Assessments (IAQM 2024)

  • Fully auditable
  • Mitigation plans
  • Reference-grade monitoring where required
    ([IAQM][iaqm2024])

Industrial & Waste Permitting Support

  • Stack emissions testing coordination
  • CEMS QA/QC under EA M20 / EN 14181
    ([GOV.UK][eaM20])

Mitigation Strategies

Mapped to:

  • Local policy
  • National PM₂.₅ targets
  • LAQM screening thresholds

5. Compliance-Safe Accreditation Statement

Alkali Environmental Consultants is a UKAS & MCERTS-accredited laboratory (No. 24303).
Monitoring and reporting are conducted to MCERTS performance standards by qualified consultants and MCERTS-certified personnel, ensuring full traceability and compliance with Environment Agency requirements.


6. Who We Help & Where We Work

We support:

  • Developers
  • Architects
  • Planners
  • Local Authorities
  • Industrial operators
  • Energy & infrastructure projects

Across:
London, Manchester, Leeds, Birmingham, Liverpool, Bristol, Newcastle, Sheffield, Nottingham, Leicester, Glasgow, Edinburgh, Cardiff, Belfast — and every major UK city.


7. About Alkali Environmental Consultants

Alkali Environmental Consultants is a UK leader in air emissions and environmental compliance.
We specialise in air quality, stack emissions monitoring, permitting and environmental risk management.

Our team includes:

  • Former Environment Agency officers
  • Nuclear environmental engineers
  • Senior air-quality specialists
  • MCERTS personnel

We combine technical accuracy with regulatory insight — helping clients stay compliant, avoid delays, and secure approvals confidently.


8. FAQ

When should I book an air quality assessment?

At RIBA Stage 2–3, or as early as possible.
Reports aligned to LAQM expectations face fewer planning queries.
([Local Air Quality Management][laqm])

Do I need dust monitoring on site?

Where IAQM 2024 risk screening indicates medium/high risk — yes.
Choose methods consistent with IAQM’s 2025 LCS position.
([IAQM][iaqm2025])

What’s the legal context right now?

  • England’s PM₂.₅ targets apply nationally
  • EA M20 governs CEMS QA/QC
  • EU 2030 limits provide context for best practice
    ([Legislation.gov.uk][leg201] | [GOV.UK][eaM20])

Sources Behind the Updates

https://www.legislation.gov.uk/uksi/2023/96/made?view=plain
https://www.legislation.gov.uk/uksi/2023/96/pdfs/uksiem_20230096_en.pdf
https://www.gov.uk/government/statistics/air-quality-statistics/concentrations-of-particulate-matter-pm10-and-pm25
https://uk-air.defra.gov.uk/pm25targets/planning
https://uk-air.defra.gov.uk/pm25targets/targets-development
https://laqm.defra.gov.uk/
https://laqm.defra.gov.uk/guidance/
https://laqm.defra.gov.uk/wp-content/uploads/2021/03/LAQM-TG22-May-25-v2.1.pdf
https://laqm.defra.gov.uk/air-quality/guidance/development-control/
https://iaqm.co.uk/wp-content/uploads/2013/02/Construction-Dust-Guidance-Jan-2024.pdf
https://iaqm.co.uk/wp-content/uploads/2013/02/IAQM-PS-Construction-Monitoring-FINAL-2025.pdf
https://iaqm.co.uk/guidance/
https://www.gov.uk/government/publications/m20-quality-assurance-of-continuous-emission-monitoring-systems
https://www.gov.uk/government/publications/m20-quality-assurance-of-continuous-emission-monitoring-systems/monitoring-stack-emissions-quality-assurance-of-continuous-monitoring
https://assets.publishing.service.gov.uk/media/6696890ca3c2a28abb50d080/MCERTS_manual_stack_emission_monitoring_performance_standard_for_organisations_LIT_5901.pdf
https://eur-lex.europa.eu/eli/dir/2024/2881/oj/eng
https://www.gov.uk/government/publications/air-pollution-in-the-uk-2024/air-pollution-in-the-uk-2024-compliance-assessment-summary
https://apps.who.int/iris/bitstream/handle/10665/345334/9789240034433-eng.pdf
https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1061492/COMEAP_Statement_on_PM2.5_mortality_quantification.pdf
https://www.gov.uk/government/news/public-health-england-publishes-air-pollution-evidence-review
https://www.gov.scot/binaries/content/documents/govscot/publications/advice-and-guidance/2024/05/local-air-quality-management-policy-guidance-2/documents/local-air-quality-management-policy-guidance/local-air-quality-management-policy-guidance/govscot%3Adocument/local-air-quality-management-policy-guidance.pdf
https://www.gov.wales/sites/default/files/consultations/2024-12/local-air-quality-and-soundscapes-management-in-wales-policy-guidance.pdf
https://www.legislation.gov.uk/asc/2024/2

NewsAir QualityLatest Environmental TechnologyPermits

Aberdeenadms roads modellingair quality assessmentair quality consultantsair quality consultants leedsair quality consultants londonair quality consultants manchesterair quality consultants ukair quality for planning applicationsair quality impact assessmentair quality management areas aqmaair quality monitoringair quality screeningambient air quality directiveannual status reports asrarchitectsautumn testing windowbaseline air quality surveyBelfastBirminghamBlackpoolBoltonBradfordBrighton and HoveBristolbrownfield remediation monitoringCambridgeCardiffcemp developmentcemp dust controlcems qa en 14181clean air strategy alignmentclean air zone compliancecomeap mortality risk pm2.5compliance reportingconstruction and civilsconstruction dust assessmentconstruction phase monitoringcontinuous air quality monitoringCoventrydata centresdata interpretation and dashboardsdefra air pollution statisticsdefra pm2.5 planning guidanceDerbydetailed dispersion modellingdiffusion tube monitoringdispersion modelling admsdry windy season march octoberDundeeea m20 cems qaqcEdinburgheducation campusesemission inventoryen 14181 qal1 qal2 qal3environment act air qualityenvironment agency m20 guidanceenvironmental permitting supportfood and beverageGlasgowhealthcare estateshighways and logisticshousebuildersHulliaqm construction dust 2024iaqm guidanceiaqm low cost sensor position 2025industrial and manufacturingInvernesslaqm development controllaqm guidanceLeedsLeicesterLiverpoollocal authoritiesLondonManchestermcerts certified personnelmcerts manual stack monitoringmcerts performance standardsmeteorological suitabilityMiddlesbroughMilton Keynesmitigation strategy air qualityNewcastleNewportno2 guideline who 2021noise and vibrationNottinghamodour assessmentOxfordpermit application supportpermit compliance auditpermit renewal cyclepharmaceuticals and chemicalsplanning approval air qualityplanning consultantsplanning submission evidencePlymouthpm10 and dust monitoringpm2.5 legal target 2040pm2.5 targets englandports and airportsPortsmouthpost completion validationpost construction validation monitoringpower stations and energypre application screeningpre construction baselinePrestonproperty developersReadingreal time dust monitoringremote consultancyriba stage 2 air qualityriba stage 3 air qualitysensitive receptors assessmentSheffieldsource apportionmentSouthamptonspring testing windowstack emissions coordinationstack emissions testingStirlingStoke on TrentSunderlandSwanseaukas accreditation 24303ukas accredited laboratoryukas iso/iec 17025Warringtonwaste and recyclingwho air quality guidelinesWolverhamptonWrexhamYork

Comments are disabled.